Installation and execution of works

Within 5-30 days from the order, we transport pumps from Italy, which is one of the fastest delivery times on the market. Experienced plumbers and electricians work for us, which allows us to professionally install and adjust the parameters of pumps and pump sets.

References

  • Procurement and adjustment of the parameters of the “Saer” submersible pump with a power of 30 KW for the Danilovgrad Water Supply company, July 2020;
  • Procurement of wastewater pump “Saer” SD series with control panel, power 3 KW for the company “Kalamper” installed at “Eko”Petrol station in Tivat , September 2020;
  • Reconstruction of the water pump station of the Podgorica Airport passenger terminal;
  • Installation of wastewater pumps and maintenance  in the resort “Azul beach Montenegro” by Karisma  on the Long beach in Ulcinj from June 2021- November 2023.
  • Installation of wastewater  pump station with control  panel and  automatics – Barska plovdba AD, March 2022;
  • Delivery and installation of a 2 x 2.2 KW power booster set in a solitaire  in Podgorica downtown – March 2022;
  • Procurement, delivery and installation of pumping stations for water and waste water for the company “Bemax” for the new Primary School “Novka Ubović” in Tološi – March 2022;
  • Procurement, transport and delivery of a firefighting pump set for sprinkler systems with EN 12845 certificate, with 2 x 30 KW pumps, for the new “Cungu” shopping center in Podgorica – November 2021;
  • Procurement, transport and delivery of a firefighting pump unit for sprinkler systems with EN 12845 certificate, with 2 x 18.5 KW pumps for the facility “Our Fruit” in Župa, Nikšić. – July 2021.
  • Procurement, transport and delivery of a firefighting unit for sprinkler systems with EN 12845 certificate, with 2 x30 KW pumps with one electric and diesel engine pump for the new facility “Next auto” in Spuž – September 2023.
  • Procurement and installation of a submersible wastewater pump with grinders and control panel  at Podgorica Airport – November 2023.
  • Procurement, transport and delivery of a fire-fighting pump unit  with 2 pumps of 75 KW  power for the company “Thermia”- December 2023

Installation of wastewater pumping station with 2 “Saer” pumps

Azul Beach Resort, Velika plaža, Ulcinj


Installation of booster set

Dobrota Palazzi, Kotor


Installation of pumps for wastewater

Azul Beach Resort, Velika plaža, Ulcinj


Installation of a 2 x 2.2 KW power booster set

Solitaire Miljana Vukova street, Podgorica downtown


Installation of wastewater pump station with control panel and automatics

Barska Plovidba AD, Bar